City of Sevierville - Logo

The City of Sevierville

It is the mission of the City of Sevierville to provide quality services while preserving and advancing the collective interests of all the citizens and visitors of our community.

Start A Business in Sevierville

Visit our one stop shop and learn about how to Start a Business in Sevierville.

Convention Center

The destination. The facility. Your event. Located within a day’s drive of over half the nation’s population and surrounded by shopping, attractions and shows, the new Sevierville Convention Center is ready to host your event.

Sevierville Golf Club

The Sevierville Golf Club features two 18-hole championship courses: "The Highlands", a par 70 that winds through lush rolling hills and fresh water mountain ponds and "The River", a par 72 that plays along and across the Little Pigeon River.

Report an Issue

Send email to report a problem to the City of Sevierville here

Report an issue or make a service request.

Connect With Us

Stay connected with the City on Facebook and X.

Online Payments

Pay water bill or file hospitality tax online here

Pay water bill or file hospitality tax online.

Welcome to The City of Sevierville

Your Hometown in the Smokies.

Dolly Parton Statue in front of Sevier County Courthouse in Sevierville, Tennessee 

Welcome to the official web site of the City of Sevierville, Tennessee.
Dolly Parton's Hometown, and your Hometown in the Smokies as well! 

We hope you enjoy our site and find the information helpful. Please feel free to look around and discover all that Sevierville, Tennessee has to offer. 

It is the mission of the City of Sevierville to provide  quality services
while preserving and advancing the collective interests
of all the citizens
and visitors of our community.

If you have any questions about our City, please call us at 865.453.5504

For more information about our city, please see the City of Sevierville Relocation Information at the bottom of this page.

VII. REQUIRED INSPECTIONS

During the construction process various authorities are required to inspect the construction at specific points.
When an inspection is to be performed by a City Inspector, 24-hour advance notice is required to guarantee the inspection at the convenience of the contractor. Requests for inspection made less than 24-hours in advance cannot be guaranteed for the time requested. Work may NOT proceed until the proper inspection(s) has been made, and approval given. Call (865) 453-5504 to request inspections.

A. Required Building Inspections:
The Building Inspector upon notification from the permit holder or his agent shall make the following inspections of buildings and such other inspections as may be necessary, and shall approve that portion of the construction as completed or shall notify the permit holder or his agent of any violation of the adopted Codes.
◾ Footing Inspection: To be made after trenches are excavated, forms erected, reinforcement placed and prior to pouring concrete.
◾ Slab Inspection: To be made prior to pouring concrete with all forms, vapor barriers and reinforcement in place.
◾ Frame Inspection: To be made after the roof, all framing, fireblocking and bracing is in place, all concealed wiring, all pipes, chimneys, ducts and vents are complete.
◾Final Inspection: To be made after building is completed and ready for occupancy.

B. Required Plumbing Inspections:
The following inspections will be required at different stages of installation. Tests will be required at each stage of installation.
◾Underground Piping Inspection: To be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place.
◾Rough-In Inspection: To be made after the roof, framing, fireblocking and bracing is in place, all soil, waste, and vent piping is complete, and prior to the installation of wall or ceiling membranes. Pressure tests will be required.
◾ Final Inspection: To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy. Contact City Inspector, City Hall, 453-5504.
◾Building Sewer form the building to the municipal tap or septic tank.

C. Required Signage Inspection:
The Code Enforcement Officer or Building Inspector, upon notification from the permit holder or his agent shall inspect the signage for compliance with the approved Site Plan and Sevierville Sign Ordinance.

Public Notices

  • Notice of PBA Meeting - 4/16/2024
    Wednesday, 17 April 2024

    This will serve as legal notice that the City of Sevierville Public Building Authority (PBA) has scheduled a meeting on Tuesday, April 16, 2024. The meeting will begin at 2:00 PM in the Administration conference room at the Sevierville City Hall, 120 Gary Wade Blvd, Sevierville, TN.

    The purpose of the meeting will be to consider a Change Order with Denark Construction, ROW...

    Read More..

  • Notice of Public Hearing - O-2024-004 - Zoning Ordinance Amendment
    Tuesday, 12 March 2024

    This will serve as legal notice that a public hearing has been scheduled to receive any public comment on the matter of amending the Sevierville Zoning Ordinance, as proposed in O-2024-004, regarding Functional Road Classifications.

    ...

    Read More..

  • Notice of 2024 Standard Meeting Times
    Thursday, 04 January 2024

    The Sevierville Board of Mayor and Aldermen hereby notifies all Citizens of the City of Sevierville, Tennessee that open and public meetings will be held for the year 2024 at the Sevierville Civic Center, 130 Gary Wade Blvd., Sevierville, Tennessee (unless otherwise noted) as follows:

    ...

    Read More..

Latest News

To see full list of positions at the City of Sevierville

Were Hiring 300

View Current Job Openings!

Upcoming Events

2 May
Planning Commission Meetings
Date 05.02.2024 5:00 pm
2 May
Board of Zoning Appeals
Date 05.02.2024 5:00 pm
2 May
Planning Commission
Date 05.02.2024 5:00 pm
6 May
20 May

City Calendar